ChisCo Rail Network, is under construction |
ChisCo Rail Network, is under construction |
Jan 22 2011, 01:43 PM
Post
#1
|
|
Page Group: Clan Members Posts: 59 Thank(s): 0 Points: 59 Joined: 8-May 10 Member No.: 4,268 |
The ChisCo railway network is currently under construction, the first station has already been completed in At Last, and the tracks have almost been built as far as Origin, will update this thread when the first route is complete and ready for use.
Once ready the stations should be fully automated with trains leaving roughly every 15 seconds, that is assuming I can find enough Iron Ore |
|
|
Jan 23 2011, 09:00 AM
Post
#2
|
|
Sergeant Group: Clan Members Posts: 301 Thank(s): 1 Points: 301 Joined: 22-April 10 From: Alderholt, Dorset/Hampshire/New Forest boarders Member No.: 4,259 |
However upon lonesome extensive study they do seem to glitch still sometimes going invisible and then having a pile up for no reason but I think I've eradicated animals now. Perhaps a fully functioning automated express is unachievable for the moment? Maybe a pick a cart and go system would be better?
-------------------- Are we going to the same place, and if so can I come?
|
|
|
Lo-Fi Version | Time is now: 24th November 2024 - 11:30 AM |