IPB





Welcome Guest ( Log In | Register )

> ChisCo Rail Network, is under construction
Chisel
post Jan 22 2011, 01:43 PM
Post #1


Page
**

Group: Clan Members
Posts: 59
Thank(s): 0
Points: 59
Joined: 8-May 10
Member No.: 4,268




The ChisCo railway network is currently under construction, the first station has already been completed in At Last, and the tracks have almost been built as far as Origin, will update this thread when the first route is complete and ready for use.

Once ready the stations should be fully automated with trains leaving roughly every 15 seconds, that is assuming I can find enough Iron Ore biggrin.gif
Go to the top of the page
 
+Quote Post
 
Start new topic
Replies
Chisel
post Jan 22 2011, 11:27 PM
Post #2


Page
**

Group: Clan Members
Posts: 59
Thank(s): 0
Points: 59
Joined: 8-May 10
Member No.: 4,268




The first section of the railway is now complete and open for business, the stations are at At Last and the Utopia Institute for Redstone Technology.

The tracks should be free from mobs so it should be a smooth ride, but the carts occasionally go a little wonky so ChisCo apologises for any inconvenience. Refunds sadly are not available.


The nearest track at At Last heads to UIRT, the furthest track atr UIRT heads to At Last (I'll add signposts later).
Go to the top of the page
 
+Quote Post

Posts in this topic


Reply to this topicStart new topic

 



RSS Lo-Fi Version Time is now: 24th November 2024 - 11:53 AM
Sneaky Monkeys Clan :: MonkeyFiend.com